Block L will be powered by a individual stage 100A distribution board. PowerOne ring circuit will supply power for the generator/switch room and substation room and will be protected by a 32A type C BS EN 60898 RCBO. An RCBO will be used because equipment could be plugged in and taken outside and it will be type C because inductive tonss could be plugged in. The other ring circuit will supply power for the workshop and public toilet and will besides be protected by a 32A type C BS EN 60898 RCBO. An RCBO will be used because equipment could be plugged in and taken outside and it will be type C because inductive tonss could be plugged in inside the workshop every bit good as equipment being used inside the public toilet. The roller shutter door will be wired on its ain radial circuit because if it faults due to rain or strive it won’t trip out a ring circuit. We will write a custom essay sample on Electrical Installation Essay Sample or any similar topic specifically for you Do Not WasteYour Time HIRE WRITER Only 13.90 / page It will besides be protected by a 16A type C MCB to let for start-up of the motor. Outside Lighting Lighting in block L will be provided by adjustments utilizing high frequence control gear to battle the stroboscopic consequence around the generator. Calculations for the five 150W high force per unit area Na suiting outside visible radiations – 150W x 5 = 750W 750W ten 1. 8 = 1350W I = P = 1350W = 5. 87A burden currentV 230VThe outside illuming radial circuit will be protected by a 10A type C BS EN 60898 RCBO. this will be required because 5. 87A is excessively close to a 6A ledgeman and will be running hot. A 10A type C will be used to let for the induction in the discharge lighting and the 10A capacity allows for more visible radiations to be added in the hereafter. Inside LightingThe interior lighting will be protected by either a 6A or 10A type B MCB depending on the circuit. The adjustments are duplicate 6ft fluorescent luminaires with each tubing rated at 70W. The computation to work out the maximal figure of luminaires on each circuit is shown below: current per suiting = P x 1. 8 ( discharge illuming factor ) Volt current per suiting = ( 2 x 70W ) ten 1. 8230V current per suiting = 1. 1A figure of adjustments = __MCB rating___current per adjustment figure of adjustments = _6A_ = 5. 451. 1A figure of adjustments = 10A = 9. 091. 1A So that the ledgeman doesn’t run hot –6A MCB – 5 adjustments10A MCB – 8 adjustments DesignationThe circuits are divided as per the pulling 2360-023-07-08-1/1. each with its ain coloring material and identified in the undermentioned manner: Function – Circuit Number – Fitting NumberFor illustration. the 3rd socket mercantile establishment on the circuit 2 ring chief in the workshop/restroom would be: P – 2 – 3 Calculations for Design CurrentIn order to make a board agenda for the lighting and power distribution board. every circuits design and diversified current has to be calculated. The maximal diversified current can non transcend the board’s 100A maximal demand. Circuit 1Concluding ring circuit ( workshop/restroom ) – 32ADiversity Factor from OSG 17th edition – 132A ten 1 = 32A Circuit 2Concluding ring circuit ( generator/substation/switchroom ) – 32A Diversity Factor from OSG 17th edition – 0. 532A ten 0. 5 = 16A Circuit 33kW roller shutter doorI = P = 3000W = 13. 04AV 230VDiversity Factor from OSG 17th edition – 113. 04A ten 1 = 13. 04A Circuit 4Lighting – Outside150 ten 5 = 750W 750W ten 1. 8 = 1350W I = P = 1350W = 5. 87A V 230V Diversity Factor from OSG 17th edition – 0. 9 5. 67A ten 0. 9 = 5. 28A Circuit 5Lighting – Switchroom ( eight 70W dual flourescent adjustments ) I = P = ( 70 x 2 ten 8 ten 1. 8 ) = 8. 77AV 230VDiversity Factor from OSG 17th edition – 0. 98. 77A ten 0. 9A = 7. 89A Circuit 6Lighting – Switchroom ( six dual fluorescent adjustments )I = P = ( 70 x 2 ten 6 ten 1. 8 ) = 6. 57AV 230VDiversity Factor from OSG 17th edition – 0. 96. 57A ten 0. 9 = 5. 91A Circuit 7Lighting – Substation room ( five dual fluorescent adjustments ) I = P = ( 70 x 2 ten 5 ten 1. 8 ) = 5. 48AV 230VDiversity Factor from OSG 17th edition – 0. 95. 48A ten 0. 9 = 4. 93A Circuit 8Lighting – Workshop ( three dual fluorescent adjustments )I = P = ( 70 x 2 ten 3 ten 1. 8 ) = 3. 29AV 230VDiversity Factor from OSG 17th edition – 0. 93. 29A ten 0. 9 = 2. 96A Circuit 9Lighting – Workshop ( three dual fluorescent adjustments )I = P = ( 70 x 2 ten 3 ten 1. 8 ) = 3. 29AV 230VDiversity Factor from OSG 17th edition – 0. 93. 29A ten 0. 9 = 2. 96A Circuit 10Lighting – Workshop ( three dual fluorescent adjustments )I = P = ( 70 x 2 ten 3 ten 1. 8 ) = 3. 29AV 230VDiversity Factor from OSG 17th edition – 0. 93. 29A ten 0. 9A = 2. 96A Circuit 11Lighting – Restroom and Toilets ( four double fluorescent adjustments ) I = P = ( 70 x 2 ten 4 ten 1. 8 ) = 4. 38AV 230VDiversity Factor from OSG 17th edition – 0. 94. 38A ten 0. 9 = 3. 94A A board agenda now has to be constructed demoing every circuits protective device. design and diversified current and the entire diversified current.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.